ABOUT US
关于华创

Three Production Bases

WuHan, HuangGang, TianJin

Owned Factory

Excellent Quality, Competitive Price.

10GW+

Annual Capacity

10 years +

Industry Experience

Complete production line

Aluminium Alloy Mounting

High-strength Steel

Ground Screw

Aluminum Ingots/Rods

Aluminium Ingot/bar
-

Extrusion production line

Forming Line
-

automated finishing

Automatic Finishing
-

anodic oxidation

Anodising
-

Semi-finished product warehouse

Semi-finished Goods Warehouse
-

Outdoor municipal works

Steel Processing
-

Landscaping works

Cold-bending Stamping Forming
-

Sewage treatment works

Laser Cutting
-

Outdoor municipal works

Robot Automatic Welding

-

Landscaping works

Surface Anti-corrosion Treatment 

-
 

Sewage treatment works

Semi-finished Product Warehouse
-

Hospital logistics sporadic maintenance

Punching
-

hospital logistics reconstruction and expansion project

Sharpening
-

Hospital logistics sporadic maintenance

Automatic Welding 
-

hospital logistics reconstruction and expansion project

Surface Anti-corrosion Treatment  
-

tab ④

HTML language content can be parsed after binding data to rich text content


information is a test element. When using, you can delete this element and place the element

you want to put.

Factory Pre-assembly


Before mass production and shipment of products, the factory will pre-assemble each component to ensure the compatibility between products and the overall stability and strength of the system;
Prefabrication is completed in the factory, and installation can be completed on-site by simply fixing and splicing fasteners. 

Factory pre-assembly
Quality control

Quality Control


Strict control from scientific design to the assembly, we conduct 6 quality inspections to achieve the whole-process monitoring;
Five major testing processes in the factory laboratory (pull-out resistance test, salt spray test, film thickness test, surface treatment composition analysis, spectral analysis) ensure product quality. Samples are regularly sent to third-party authorities for inspection.

CPP

CPP

UL

UL

IEC

IEC

SGS

SGS

TUV

TUV