E-mail Us
en

A promise must be kept, a mission must be fulfilled.|CNTSUN achieves high performance scores in 550 MW Shache, Xinjiang PV project.

Table of Content [Hide]

    Solar Mounting System Procurement for the 550 MW Portion of the 2000 MW PV Storage Integrated Project in Shache County, Xinjiang, by Guangdong Energy Group (EPC General Contract) is situated in Shache County, Kashgar Prefecture, Xinjiang. The installed capacity of the project contains 550 MW on the AC side and 715.0286 MWp on the DC side, with an energy storage system configured at 137.5 MW/550 MWh.


    As a key project to be promoted in Shache County, its completion will reduce local carbon dioxide emissions and provide a clean and reliable energy supply for residents. Additionally, the project can also bring substantial social and economic benefits, promoting regional economic development.


    Following the successful bid, CNTSUN designated the project as one of its key strategic initiatives. All departments collaborated closely to make predictions in advance and conduct repeated deductions for successful completion. All CNTSUN personnel demonstrated determination and resilience in the face of various obstacles and challenges, actively seeking solutions without fear of difficulty. Despite the hot weather, all staff strive hard to ensure the smooth project delivery. CNTSUN's two major factories in the north and south are operating in close coordination to enhance production. Inside the workshops, the workers are absorbed in working under the bright light; Outside, lines of heavy trucks are queuing up, ready to be loaded and poised for departure.

    a_promise_must_be_kept_a_mission_must_be_fulfilled_cntsun_achieves_high_performance_scores_in_550_mw_shache_xinjiang_pv_project_(2).jpg

    The road may be long, but it can be reached through determined practice. Things may be tough, but they can be accomplished through perseverance. This summer, CNTSUN reaped the rewards of determination and perseverance. The contract fulfillment team achieved an impressive record of shipping 20 truckloads per day for a single project, whose supply volume is far outpacing other manufacturers in the bidding section. CNTSUN staff completed the production, transportation, and delivery of the mounting systems smoothly.


    Across the vast expanse of the Gobi Desert, rows of PV panels resemble a silver ocean, shimmering under the sun, which will continuously inject green energy into local development. In the golden September, a good time for harvest, CNTSUN receives praise from customers for its high-quality products and efficient services. Looking back on the months of contract fulfillment, CNTSUN staff have achieved gratifying results through determined efforts, racing against time, and overcoming challenges. The prominent 'CNTSUN' flag flutters at the project site, embodying the spirit of 'efficiency, pragmatism, and cooperation' among our team.Those who strive move forward, but only those who are pragmatic are strong. With dreams ahead and the path beneath our feet, it is through responsibility that we can fulfill our mission, and only through practical efforts that we can achieve the future. The CNTSUN team will continue to forge ahead with unwavering dedication.


    CNTSUN will strive to promote the organic integration of ecological, social, and economic benefits, leading the way in clean energy trends through our practical actions and contributing to the high-quality development of the industry.


    References
    Contact Us
    027-86951865 info@cntsun.com
    No. 792 Gaoxin Avenue, East Lake New Technology Development Zone, Wuhan, Hubei Province
    Shine with Sun, Stand with Wind
    Contact Us 027-86951865 info@cntsun.com
    No. 792 Gaoxin Avenue, East Lake New Technology Development Zone, Wuhan, Hubei Province
    Shine with Sun, Stand with Wind